Perito Moreno Highway. Stages I, II Y III
The project was executed in 3 stages in order to achieve the urban redevelopment and adaptation to the Heavy Traffic Network of the Perito Moreno Avenue, by recovering the supporting structure of the existing structural package. A simple concrete pavement was adopted with mesh gap of 0.28 m thick crack with integral cords; so that it rests on a base of cement floor of 0.20 m of thickness and a sub-base of selected soil of 0.35 m of thickness.
I also contemplated, the calculation of the new structural package and the subsequent concrete road, the static and dynamic reinforcements and other restorative actions, in order to be categorized, according to the corresponding loads, for heavy transit.
In addition, the green spaces were reorganized; the environments of Av. Perito Moreno were investigated and the current pedestrian bridges and lighting, afforestation and detection of the common places to the highway were commissioned.
COMITEE
Autopistas Urbanas S.A. (AUSA)
LOCATION
CABA
EXECUTION DATES
2009 - 2010