Engineering

Berisso Pumping Station

We built a pumping station to alleviate floods due to heavy rains in Genova St. and its surroundings.

The civil work consisted in the execution of a reinforced concrete pumping station founded on piles and a reinforced concrete drainage channel.

The electomechanic works consisted in the mounting of 6 bombs of 1000 l/s and a power of 8.8 Kw each, commanded by a float system and PLC and by a generator set of 500 KVA to equip the automation system

COMITEE

Gobierno de la Provincia de Buenos Aires

LOCATION

Berisso - Pcia. de Buenos Aires

EXECUTION DATES

1990 - 1999

TOTAL AREA

-